| Capabilities |
Benefits |
|
|
| Schedule Network Functions |
- Features rich CPM network analysis
- Robust network data entry and manipulation
- Flexible network navigation tool
- Real-time network calculations
- Path To…Path From…
- Unlimited number of networks, sub-networks, activities and links
- Unlimited numbers of summary levels
- Unlimited number of calendars for activities and resources
- Flexible coding to organize projects
- Assign, update, read, test, exclusive or no access to network or sub-networks
- Compatibility with all major planning and scheduling applications including Microsoft® Office Project and Primavera P3/P3E
|
|
|
| Calendars |
- Unlimited number of calendar sets and calendars
- Multiple calendars per network
- User-defined number of working hours per day
- Day or hourly-based scheduling
- Easy to use calendar editor
|
|
|
| Resource and Cost Management |
- Resource type libraries
- Resource profiles/distribution libraries and user defined profiles for resource distribution
- Variable Resource availability
- Cost calculated from resources or as fixed Cost
- Resource progress
- Interactive graphics resource assignment
- Automatic, semi-automatic and manual resource leveling
- Unlimited number of resources
- Resource type by labor, manhour, cost material and other
- Unique traceability from resource loading
- Resource and time-constraint scheduling
|
|
|
| Project progress and status control |
- Structured Status entry features
- Automatic analysis of current schedule
- Frontlines against volume and/or time
- User-defined Weight factor calculations
- Performance measurement calculations
- Earned Value analysis and reporting
- Forecast, Current and revised schedule calculations and analysis
- Flexible roll-ups for executive summaries
- Level generated networks
- Integrated resource and cost in real-time
- WBS, OBS summaries
- Comparison of baseline, planned, current and actual values
|
|
|
| Baseline Management |
- Unlimited number of baselines
- Flexible user definable inclusion of variations and changes into baseline
- Full traceability of baseline history through multiple baselines
|
|
|
| Sensitivity Analysis and “What –If ’s” |
- Comparison of two or more plan versions
- Flexible forecast functions
- Revised schedule comparison
|
|
|
| Change and variation order control |
- Schedule impact documentation and analysis
- Documentation of scope growth over time
- Full traceability of each item of change
- Status tracking of changes
- Automatic comparison between baseline and current plan and estimates
|
|
|
| Project History |
- Period by period data storage of baseline, planned dates and past period performance
- Full traceability through project life cycle
|
|
|
| Reporting |
- Integrated report generator
- Fully configurable reports
- User defined selection and sort and including excellent query support for filtering
- Full format and layout control
- Stored report specifications, user or group
- Print Preview
- Report Save as option for rapid distribution
- Output as HTML, JPG, Metafiles and BMP
- E-mailed enabled reporting
- Barchart, Histogram, S-curves,Table graphs, Pert Charts
- Extensive performance and comparison reporting
- Easy creation of ad-hoc reports
- Reports can be included in report packages for weekly and monthlyreporting
- Progress Charts; comparison of baseline, current, revised, forecast and actual
|